中铁二院(广东)港航勘察设计有限责任公司

    Guangzhou Nansha Dagang block project "51" persistence revision

       Click volume:4892

    The comprehensive development project of Guangzhou Nansha New Area Dagang advanced manufacturing base (EPC+PPP) is the largest urban complex project currently awarded by the group. The project is located in the new union island area of Dagang Town, Nansha District. It covers an area of about 8.21 square kilometers, and the total investment of the whole block is 10 billion 400 million yuan. The company is responsible for the investigation and design of site leveling, municipal road and bridge engineering, comprehensive corridor engineering, water and landscape engineering and public construction supporting projects, with a contract amount of about 240 million yuan.
    Due to the change in the content of the control detailed planning of the Dagang advanced manufacturing base, according to the requirements of the owners' related meetings, the second Institute of China Railway is responsible for the study and compilation of the sub project projects in the planning block. Guangzhou Nansha new area infrastructure project department and the overall group of participants actively respond to the requirements of the owners, and work together in a very short time to complete the work of research and revision of various sub projects in the planned block.


    In April 25, 2018, Guangzhou Nansha Industrial Park office, Nansha industrial construction management company, Nansha Industrial Park Development and management company jointly hosted the review meeting of the feasibility study report of the comprehensive development project of the Guangzhou Nansha New Area Dagang advanced manufacturing base area. Nansha District development and Reform Bureau, land and resources and Planning Bureau, construction and Transportation Bureau, environmental water administration bureau, engineering credit bureau, power supply bureau, Nansha Waterway Bureau, fire brigade, China Railway Pearl River Delta Investment Development Co., Ltd. participated in the meeting. The experts listened to the report of the Institute of iron and iron II, consulted the relevant information, and formed the opinion after discussion: the content of the research report is basically complete, the plan is basically feasible and the depth basically meets the requirements of the regulations. In principle, the expert group agrees to pass the review and can be used as the next stage of the work. Make a basis for it.
    In April 26, 2018, in the conference room of the third floor of Guangzhou branch of the Chinese Railway Second Hospital, Dong Yong, the management department of the group company, held the eighth promotion meeting of Dagang project. The deputy general manager of Li Shengquan participated in this meeting. It affirmed the study (Revision) through the expert review, and made important indication that the project should meet the requirements of the owner. The feasibility study (Revision) should be revised according to the experts' comments, and the results were submitted in April 30th.
    Guangzhou Nansha new area infrastructure project department and the general group members conscientiously implement the relevant requirements of the promotion meeting, give up the holiday of May 1, work hard to take root, stick to the job, and work hard to combine the design intention of the second hospital team with the expert group opinions fully to carry on the son Xiang Keyan (Revision), and complete the sub item on time. Revision) revision.
    Correspondent: Chen Guansan, Hong Kong Airlines

    [Return]