中铁二院(广东)港航勘察设计有限责任公司

Senegal port Falaimei iron ore project


Senegal Faleme Iron Mine Port Ancillary Facility Project:  The location is within Sendou of Bargny, west Senegal. The distance between Dakar and the project location is about 40km. The proposed engineering projects include two 150,000DWT berths for ore and one 50,000DWT berth for coal, with 951m terminal length, 4,300m approach bridge length, 1,035m inland depth and 996,000m² inland area. The estimated port handling capacity will be 20.03Mtpa of ores and 1.15Mtpa of coal. The total investment of the project is 6.27 billion, among which the investment of the ore terminal and its ancillary facilities is 5.6 billion and the remaining 670 million will be spent on the construction of coal terminal and its relevant ancillary facilities.